How we work

From first consultation to handover, with one accountable team throughout.

Process & capability

From consultation to handover.

SOVA design and engineering team coordinating a luxury villa fit-out in Dubai
Site coordination · design direction
  1. 01

    Consultation

    We listen to how you live or work and agree the brief, priorities and timing.

  2. 02

    Survey

    Measured survey of the space, structure and existing services.

  3. 03

    Concept

    Layouts, mood, materials and lighting direction, refined with you.

  4. 04

    Technical design

    Construction and shop drawings, finishes schedule and coordination with all trades.

  5. 05

    Production

    Kitchens, wardrobes and joinery made in our production facility in Umm Al Quwain.

  6. 06

    Installation

    Our own team installs, aligns and finishes every piece on site.

  7. 07

    Quality check

    Dimensions, finishes, hardware and services checked at each stage.

  8. 08

    Handover

    A joint walk-through, snags closed out, final clean and handover.

Approval

Nothing is made until you sign off.

Before production, you receive detailed drawings and a finishes schedule, and you review physical samples of veneers, lacquers, stone and hardware in your own space.

Production starts only after written approval, so the joinery that arrives on site is exactly what you agreed.

Custom joinery
Illustrative image of a team comparing stone, timber and fabric samples during material selection
Material review · illustrative image

Workshop

Controlled production.

Advanced precision machinery, skilled craftsmanship and controlled finishing, working together from shop drawing to final installation.

Shop drawings set every dimension, edge and hardware position. Panels are cut and machined on precision equipment, finished in controlled conditions and checked before they leave the workshop.

Close-up of a dovetailed walnut drawer with a velvet-lined jewellery insert and integrated lighting

Installation & snagging

Fitted, aligned, inspected.

Our own team installs and aligns every piece, coordinates with other trades on site and protects finished areas as work progresses.

Before handover we walk the space with you, record any snags, close them out and leave the space clean and ready to use.

Turnkey renovation
Illustrative image of a site team in safety gear reviewing drawings inside an interior under fit-out
Site coordination · illustrative image

Questions

About the process

How do we start?

Send an enquiry through this website. We will contact you to arrange a consultation and site visit to measure and understand the brief.

How long does a project take?

It depends on the scope, materials and approvals. After the site visit we provide a written programme covering design, production and installation.

Do you work in occupied homes?

Yes. We agree working hours with you and protect finished areas during installation.

Full renovation

From first survey to final handover.

One team carries your renovation through fourteen clear stages, with design, site works and factory-made joinery on one programme.

Illustrative image of a site team in safety gear reviewing drawings inside an interior under fit-out
Start your renovation
  1. 01

    Brief

    We listen to how you live or work, agree priorities, scope and timing.

  2. 02

    Site survey

    Measured survey and review of existing structure, services and finishes.

  3. 03

    Concept

    Layouts, mood and material direction, refined with you.

  4. 04

    Approvals & coordination

    Drawings prepared and coordinated with building management and the relevant parties where approvals apply.

  5. 05

    Detailed design

    Construction drawings, finishes schedule, lighting and joinery details.

  6. 06

    Procurement

    Materials, stone, fittings and hardware ordered against the approved schedule.

  7. 07

    Demolition

    Protected, phased strip-out and site preparation.

  8. 08

    MEP

    Mechanical, electrical and plumbing works coordinated with the new layout.

  9. 09

    Fit-out works

    Partitions, ceilings, flooring, stone and wall finishes.

  10. 10

    Factory production

    Kitchens, wardrobes and joinery made in our Umm Al Quwain factory from approved shop drawings.

  11. 11

    Installation

    Our own team installs, aligns and finishes every piece on site.

  12. 12

    Quality control

    Checks on dimensions, finishes, hardware and services at each stage.

  13. 13

    Snagging

    A joint walk-through, with every snag recorded and closed out.

  14. 14

    Handover

    Final clean, documentation and a finished space ready to use.

Factory & capability · Umm Al Quwain

Made in our own joinery factory.

Advanced precision machinery, skilled craftsmanship and controlled finishing, working together from shop drawing to final installation.

Every kitchen, wardrobe and joinery piece follows the same controlled route, from material inspection to installation by our own team. Our engineers coordinate site dimensions, services and hardware before production starts.

Close-up of a dovetailed walnut drawer with a velvet-lined jewellery insert and integrated lighting
  1. 01

    Material inspection

    Boards, veneers, stone and hardware are checked on arrival against the approved schedule.

  2. 02

    Precision cutting

    Panels are cut on CNC precision machinery, set out from approved shop drawings.

  3. 03

    Edge finishing

    Edges are banded and finished so every visible line is clean and consistent.

  4. 04

    Drilling & machining

    Hinge, runner and fixing positions are machined for accurate, repeatable assembly.

  5. 05

    Assembly

    Carcasses, drawers and internal fittings are assembled and checked.

  6. 06

    Controlled finishing

    Lacquer and veneer finishes are applied and inspected in controlled conditions.

  7. 07

    Quality control

    Dimensions, finish and hardware are checked before anything leaves the factory.

  8. 08

    Installation coordination

    Delivery is timed to the site programme and installed by our own team.

Start your project

Let’s design, build and complete your space.

Tell us a little about your space. We will contact you to arrange a consultation and site visit.

Studio
Dubai, UAE
Production
Umm Al Quwain, UAE
Projects
All seven Emirates